Back to All Events

NACSW K9 Nose Work Trial NW3/NW1


  • Sequim, WA, 98382 United States (map)



Friday & Saturday - April, 19 / 20, 2024 Sequim, WA

Factor in extra time if your weekday ferry plans include travel across the State Route 104 Hood Canal Bridge. On Monday, April 15, WSDOT crews will begin an in-depth inspection of the bridge that involves opening the draw span occasionally. This work requires closing the bridge to all traffic for up to an hour around 10 a.m. and 2:30 p.m. each weekday. The exact time could vary depending on work progress. The inspection is scheduled to wrap up Friday, April 26.

Details and information, including opening date (click on Premium):

Premium

The draw period for the trial will open on March 5, 2024 at 9:00am PST. Click on link below for entry.

NW3

NW1

Questions can be sent to Carol Forsberg at SequimTrial@gmail.com

The volunteer positions are full. Thank you for your interest.

Sequim is a beautiful tourist destination. Secure a place to stay.

List of Veterinarians

Hotels and Camping